Indian Forging Supplier — Mozambique, Africa's Largest LNG Project (12 MTPA) and Emerging Energy Hub

Forging Supplier Mozambique | Indian Forgings for TotalEnergies LNG, ENI Coral FLNG, Sasol — NORSOK, API 6A | Shivam Forge

Shivam Forge exports NORSOK M-650, API 6A PSL3, and EN 10204 3.1-certified precision hot forgings to Mozambique — supplying TotalEnergies Mozambique LNG (Cabo Delgado province — 12 MTPA — Africa's largest LNG project, $20B investment — Areas 1 and 4 in the Rovuma Basin), ENI Coral FLNG (Africa's first and world's #7 FLNG vessel — 3.4 MTPA offshore LNG, 220m LOA, moored at Rovuma Basin 45 km offshore), Sasol's Temane Gas Processing Plant (Inhambane province — 260 MMcf/day natural gas production for Mozambique and South Africa via the 865 km ROMPCO pipeline), and the Mozal Aluminium Smelter (BHP 47.1% — Maputo, 580,000 t/year Al — Sub-Saharan Africa's largest aluminium smelter). Super Duplex 2507 (UNS S32750), Alloy 625 (UNS N06625), NORSOK M-650, API 6A PSL4, PED 2014/68/EU. CIF Pemba/Maputo 18–22 days from Mundra. Call +91-9265772827.

Request QuoteView Products
12 MTPA LNG

TotalEnergies Mozambique LNG — Africa's Largest LNG Project

5 Trillion m³

Rovuma Basin — One of World's 10 Largest Gas Fields

Africa First

ENI Coral FLNG — Africa's First Floating LNG Vessel

580K t/year

Mozal Aluminium — Sub-Saharan Africa's Largest Smelter

Mozambique — Africa's Next LNG Superpower With the World's Largest Frontier Gas Discovery

Mozambique's Rovuma Basin (offshore Cabo Delgado province — discovered 2009–2012) holds one of the world's largest natural gas discoveries of the 21st century: 5 trillion m³ of proven natural gas reserves (one of the world's 10 largest gas fields — equivalent to 30 billion barrels of oil equivalent), split across two areas. Area 1 (TotalEnergies operator 26.5%, Mitsui 20%, ONGC Videsh 10%, ENH 15%, BPRL Ventures 10%, Oil India 4%, PTTEP 8.5%, ENI 3.5%) targets 12 MTPA of LNG from 2 trains on a coastal LNG facility at Afungi Peninsula, Palma (construction suspended since April 2021 due to insurgency, with TotalEnergies announcing restart evaluation in 2024). Area 4 (ENI 50%, ExxonMobil 35.7%, CNPC 28%, Galp 10%, ENH 10%, Kogas 10%): ENI's Coral South FLNG vessel (Africa's first FLNG — delivered May 2022, first LNG cargo June 2022, 3.4 MTPA production, 100% contracted to BP under 20-year SPA) demonstrates the commercial viability of Rovuma Basin gas. The FLNG vessel — built by Samsung Heavy Industries (Geoje, South Korea) — contains world-class forged components for its topsides processing train, LNG liquefaction modules, and mooring system. Shivam Forge delivers CIF Pemba (Cabo Delgado port) or CIF Maputo (capital port) in 18–22 days from Mundra.

Mozambique Energy Clients

TotalEnergies Mozambique LNG — 12 MTPA, Africa's Largest LNG (Afungi, Palma)

TotalEnergies Mozambique LNG (Area 1 operator, Afungi Peninsula, Palma district, Cabo Delgado — 12 MTPA from 2 LNG trains, $20B investment — Africa's largest single LNG project): LNG plant cryogenic heat exchanger header forgings in A350 LF3 (−162°C service, Charpy at −196°C ≥54 J — main cryogenic exchanger inlet/outlet headers), MCHE (Main Cryogenic Heat Exchanger — spiral wound plate-fin type) nozzle forgings in A182 F304L, LNG storage tank annular plate forgings in 9% Nickel steel (SA553 Type 1). Project restart expected 2024–2027. API 6A PSL3, NACE MR0175 (well completion), ASME Section VIII.

ENI Coral South FLNG — Africa's First FLNG, 3.4 MTPA (Samsung SHI Built)

Coral South FLNG (ENI 50% — first cargo June 2022, 3.4 MTPA LNG, 220m LOA FLNG vessel built by Samsung Heavy Industries Geoje, moored 45 km offshore — 100% contracted to BP under 20-year SPA): FLNG topsides gas processing train nozzle forgings in A182 F304L (raw gas at −20°C, CO2 removal), slug catcher inlet forgings in A182 F316L (condensate service), LNG liquefaction compressor casing forgings in 4140 Q+T (refrigerant compression), and mooring chain fairlead forgings in S690QL (DNV GL certified for FLNG turret mooring). NORSOK M-650 material qualification.

Sasol Temane Gas Processing — 260 MMcf/Day (Inhambane, Mozambique)

Sasol Temane (Inhambane province — Sasol 25%, ENH 25%, Companhia Moçambicana de Hidrocarbonetos 50%: Central Terrace Complex — 260 MMcf/day natural gas processing, Pande-Temane field): gas processing plant nozzle forgings in A182 F316L (CO2 + H2S service — Temane gas has 3% CO2), gas dehydration column nozzle forgings in A182 F316L (MEG glycol service), and the ROMPCO pipeline (Republic of Mozambique Pipeline Investment Company — 865 km, Temane → Secunda South Africa) pipeline valve body forgings in A105N (API 6D, ASME B31.4). CIF Beira port then road 350 km to Temane.

Mozal Aluminium Smelter — 580,000 t/Year (BHP 47.1%, Maputo)

Mozal (Mozambique Aluminium — BHP 47.1%, IDC South Africa 24%, IFC 11.4%, GdM 3.4% — Matola, Maputo — Sub-Saharan Africa's largest aluminium smelter, 580,000 t/year Al from Hillside pot lines): aluminium reduction cell bus bar clamp forgings in A105N, anode rod connector forgings in naval brass (CuZn38Sn, seawater service for cooling water system), and potroom overhead crane wheel axle forgings in 42CrMo4 Q+T. Mozal uses Australian bauxite (→ Queensland alumina) imported via Maputo port and Mozambique's hydroelectric power (Cahora Bassa HPP 2,075 MW via 1,350 km HV line).

ROMPCO Pipeline — Mozambique-South Africa Gas Export (865 km)

ROMPCO (Republic of Mozambique Pipeline Investment Company — Sasol 50%, CMH 25%, IDC 25%: 865 km Temane → Secunda pipeline, 120 MMcf/day design capacity — the primary gas export route for Mozambique's onshore gas to South Africa's industrial heartland): ball valve body forgings in A105N (ASME B16.34, DN 300–600, Class 600), pipeline flange forgings in A694 F60 (X60 pipe flanges), and compressor station shaft forgings in 42CrMo4 Q+T (for the 3 ROMPCO compressor stations at Vilanculos, Machipanda, and Ressano Garcia). ASME B31.4 and EN 10204 3.1.

ONGC Videsh — India's 10% Stake in Area 1, ONGC Vendor Documentation

ONGC Videsh Limited (OVL — India's international upstream NOC, 10% stake in TotalEnergies Area 1 Mozambique LNG — $2B investment) provides India-specific procurement preferences for Area 1 LNG project construction and FEED (Front-End Engineering Design). OVL's stake enables direct procurement through OVL-approved Indian vendors for Area 1 project material requirements. Shivam Forge's qualification as an OVL-approved forging supplier provides direct access to Mozambique LNG procurement requirements during the project restart and construction phase (expected 2024–2027).

Standards and Logistics

NORSOK M-650 — LNG Plant and FLNG Critical Component Qualification

NORSOK M-650 (Norwegian Oil and Gas Association — Material Qualification for Subsea and LNG Service) requires QPT (Qualification Parameter Testing) for all materials in cryogenic LNG service and sour gas service: Super Duplex 2507 Charpy at −46°C ≥45 J, 9% Nickel steel Charpy at −196°C ≥40 J, and metallographic examination. ENI's FLNG and TotalEnergies LNG projects both apply NORSOK M-650 for critical forged materials qualification.

API 6A PSL3/PSL4 — Rovuma Basin Well Completions

TotalEnergies Area 1 and ENI Area 4 well completions in the Rovuma Basin: deep offshore wells (1,500–2,500m water depth) require API 6A PSL3 or PSL4 for wellhead and subsea Christmas tree forgings. PSL4 (the most stringent) adds: leak-tested before shipment at 1.1× rated working pressure, NDE on all accessible surfaces, and detailed body lot traceability. Subsea wellhead housing forgings in AISI 8630M (the standard subsea wellhead alloy — Rm ≥1,035 MPa, NACE MR0175, API 6A PSL4).

CIF Pemba / Maputo — 18–22 Days from Mundra via Indian Ocean

Port of Pemba (Cabo Delgado — closest port to Rovuma Basin LNG project, 200 km from Afungi): sea transit from Mundra 18–22 days via Indian Ocean (direct East Africa service — Mundra → Pemba via Mombasa feeder). Port of Maputo (MPDC concession — Sub-Saharan Africa's fastest-growing port, 25 million tonnes/year): 18–22 days from Mundra for Mozal and ROMPCO pipeline equipment. Mozambique import duty: 5–20% depending on HS classification (most industrial equipment at 5–7.5%).

Cryogenic Alloys — A350 LF3 and 9% Nickel Steel for LNG Service

LNG plant cryogenic service (−162°C for liquefied natural gas at atmospheric pressure): A350 LF3 (low-temperature carbon-manganese steel, Charpy at −101°C ≥54 J — used for LNG inlet headers and piping flanges down to −101°C service), and 9% Nickel steel (SA553 Type 1 — 9% Ni content, Charpy at −196°C ≥54 J — used for LNG storage tank shell plates and inner dome nozzle forgings, the material standard for cryogenic LNG storage worldwide). Both A350 LF3 and SA553 Type 1 forgings are in our standard product range for LNG project supply.

Mozambique — Africa's Next LNG Superpower With the World's Largest Frontier Gas Discovery

Mozambique's Rovuma Basin is one of the most significant natural gas discoveries of the 21st century — and Africa's most important emerging LNG export hub. The discovery sequence: ENI's Mamba South 1 well (Area 4, October 2011 — 17 TCF recoverable gas — world's largest deepwater discovery in 2011), followed by Anadarko's/TotalEnergies' Prosperidade 1 and Golfinho wells (Area 1, 2012 — 75 TCF total area resource) — established the Rovuma Basin as the world's fourth-largest LNG province after the Middle East (Qatar, Iran), Australia (NW shelf, Browse, Gorgon), and the East Africa corridor (Tanzania's offshore blocks). The total Rovuma Basin gas resources (Mozambique side: 5 trillion m³ proven = 180 TCF, with unproven upside of 250+ TCF) represent 3% of world total natural gas reserves — a resource base equivalent to 15× Mozambique's current GDP. TotalEnergies Mozambique LNG (Area 1 operator since acquiring Anadarko's African assets in 2019 for $8.8B — the world's largest upstream oil and gas acquisition) targets 12 MTPA LNG production from 2 onshore liquefaction trains at Afungi Peninsula, Palma — Africa's largest single LNG investment at $20B. The project was 74% complete when TotalEnergies declared force majeure in April 2021 due to insurgent attacks in Cabo Delgado province. As security stabilizes under Rwandan and SADC military intervention (2021–2024), TotalEnergies is evaluating project restart — creating significant forging procurement demand for the remaining 26% of construction once work resumes.

ENI's Coral South FLNG (Floating Liquefied Natural Gas) vessel — built by Samsung Heavy Industries at Geoje, South Korea, delivered to Mozambique's Rovuma Basin in May 2022 and producing its first LNG cargo in June 2022 — is Africa's first FLNG and the world's seventh FLNG vessel. Coral South FLNG (220m long, 66m wide, 220,000 DWT displacement — one of the world's largest offshore structures) processes 150 MMcf/day of raw Rovuma gas from 6 subsea wells on Coral South (Area 4) through: slug catchers, acid gas removal (AGRU — CO2 removal to <50 ppm), dehydration (glycol), mercury removal, and liquefaction (mixed refrigerant MR cycle — propane pre-cooling + MR cooling — identical process to Shell's Pearl GTL but miniaturized for FLNG). The LNG is transferred directly to LNG tankers via ship-to-ship transfer — no onshore LNG terminal required. 100% of Coral FLNG production is contracted to BP under a 20-year LNG sales and purchase agreement at approximately $12–14/MMBtu — one of the highest-value long-term LNG offtake agreements in Africa. The topsides processing train equipment (slug catchers, heat exchangers, compressors, columns) required during the construction phase at Samsung's Geoje shipyard: stainless steel nozzle forgings (A182 F304L, F316L), cryogenic forgings (A350 LF3 for gas processing down to −40°C), and compressor casing forgings (4140 Q+T for the refrigerant compressors). Shivam Forge supplied Samsung SHI's procurement for similar FLNG topsides forgings, establishing our credentials for the next Mozambique LNG FLNG projects.

Sasol's Mozambican gas operations — centered on the Pande and Temane fields in Inhambane province (southern Mozambique) — represent a different and important segment of Mozambique's energy sector: low-sulfur, low-CO2 onshore gas production (compared to Rovuma's offshore high-CO2 gas) through the Temane Central Processing Facility (CPF — 260 MMcf/day current production, expandable to 350 MMcf/day under PSA agreements). The 865 km ROMPCO pipeline (Republic of Mozambique Pipeline Investment Company — Sasol 50%, Companhia Moçambicana de Hidrocarbonetos 25%, IDC South Africa 25%) carries Temane gas to Sasol's Secunda synfuels complex in Mpumalanga, South Africa — the world's only commercial CTL (coal-to-liquids) plant (Secunda uses Lurgi fixed-bed coal gasifiers + Sasol's own Fischer-Tropsch technology to produce 150,000 bbl/day of synfuels from 45 million tonnes/year of Mpumalanga coal). The ROMPCO pipeline valve bodies (API 6D, DN 300–600 Class 600), pipe flanges (A694 F60 for X60 pipe), and compressor station shaft forgings (42CrMo4 Q+T for the 3 compression stations) represent ongoing MRO procurement opportunities for Indian forge shops. Delivery CIF Beira port (Sofala province — 350 km north of Inhambane by road — nearest major port to Temane) in 18–20 days from Mundra.

Shivam Forge's Mozambique strategy: (1) LNG cryogenic expertise — TotalEnergies Mozambique LNG and ENI Coral FLNG require A350 LF3, 9%Ni steel, and A182 F304L cryogenic forgings; our complete cryogenic forging range with NORSOK M-650 QPT documentation satisfies both projects' material requirements; (2) ONGC Videsh connection — OVL's 10% stake in TotalEnergies Area 1 gives Indian forge shops preferred procurement access through OVL's Indian vendor mandate; (3) Super Duplex and nickel alloy capability — Rovuma Basin's deep offshore wells require NACE MR0175-qualified Super Duplex 2507 (PSL4 API 6A) for sour gas wells; (4) Samsung SHI supply chain — Coral South FLNG was built at Samsung SHI Geoje (where we supply marine forgings — CIF Ulsan/Busan 12–16 days), creating an existing supply relationship for future Mozambique FLNG projects (Coral North FLNG planned by ENI, Coral 2 FLNG under development); (5) Mozal aluminium supply — BHP's Mozal smelter (Sub-Saharan Africa's largest) provides forging procurement independent of LNG project status. Contact our Mozambique/Africa team at +91-9265772827.

Frequently Asked Questions

Can Shivam Forge supply cryogenic forgings for TotalEnergies Mozambique LNG?

Yes. For TotalEnergies Mozambique LNG (12 MTPA, Afungi) cryogenic service at −162°C: MCHE header forgings in A350 LF3 (Charpy at −101°C ≥54 J), LNG storage tank nozzle forgings in 9% Nickel steel SA553 Type 1 (Charpy at −196°C ≥54 J), and LNG pump suction nozzle forgings in A182 F304L. ASME Section VIII material certificates and NORSOK M-650 QPT documentation.

Can you supply FLNG topsides forgings for ENI Coral South FLNG?

Yes. For Coral South FLNG (ENI, Samsung SHI built, 3.4 MTPA): gas processing train nozzle forgings in A182 F304L (raw gas cryogenic service), slug catcher inlet forgings in A182 F316L, and LNG compressor casing forgings in 4140 Q+T. For mooring: fairlead forgings in S690QL (DNV GL certified). NORSOK M-650 QPT and EN 10204 3.2 third-party inspection.

What is the transit time from India to Mozambique?

18–22 days CIF Pemba (Cabo Delgado — closest to TotalEnergies LNG site) or CIF Maputo from Mundra via Indian Ocean East Africa service. Air freight Mumbai → Pemba (POL) or Mumbai → Maputo (MPM): 4–6 days via Nairobi or Addis Ababa. Mozambique import duty: 5–7.5% for most industrial forgings.

Can you supply ONGC Videsh-qualified forgings for Area 1 Mozambique LNG procurement?

Yes. ONGC Videsh's 10% stake in TotalEnergies Area 1 creates OVL procurement participation. Our OVL approved vendor qualification provides direct access to Mozambique LNG project material procurement. OVL's India procurement mandate prefers Indian-origin certified materials — our Rajkot-manufactured cryogenic (A350 LF3, 9%Ni steel) and sour service (AISI 8630M, Super Duplex 2507) forgings satisfy Area 1 material requirements.

Can you supply Sasol Temane gas processing plant forgings?

Yes. For Sasol Temane (260 MMcf/day, Inhambane): gas processing nozzle forgings in A182 F316L (CO2 + 3% CO2 Temane gas service), gas dehydration column nozzle forgings in A182 F316L, and ROMPCO pipeline valve body forgings in A105N (API 6D, DN 300–600). CIF Beira port in 18–22 days from Mundra then road 350 km to Temane.

Can you supply Mozal aluminium smelter forgings?

Yes. For Mozal (580,000 t/year Al, Matola, Maputo — BHP/IDC): aluminium reduction cell bus bar clamp forgings in A105N, anode rod connector forgings in naval brass (CuZn38Sn), and potroom overhead crane wheel axle forgings in 42CrMo4 Q+T. CIF Maputo in 18–22 days from Mundra — 10 km from Matola smelter.

Why Choose Shivam Forge

Trusted forging manufacturer — Rajkot, Gujarat

Shivam Forge delivers precision hot-forged components from our integrated Shapar, Rajkot facility — covering forging, CNC machining, heat treatment, and quality inspection under one roof.

  • Hot forging from quality alloy steel billets (42CrMo4, C45, EN8, SS316L)
  • In-house CNC/VMC machining to drawing — ±0.05mm tolerances
  • Heat treatment — normalizing, hardening, tempering, annealing
  • CMM inspection and full EN 10204 3.1 material certification
  • Custom OEM forging from customer drawings — PPAP/ISIR available
  • Fast export from Mundra Port — CIF worldwide, FOB India
  • Export expertise — Europe, Middle East, Americas, Asia-Pacific